Why most “AI projects” stall
A common LatAm pattern: someone asks to “add AI”, a chat demo ships in a week, and three months later nobody uses it. The failure is rarely the model — it is scope, data and metrics.
A ~30-day pilot (usually 2–4 weeks of build) is not a finished product. It is a controlled experiment with a fixed budget and one clear business question.
Step 1 — Outcome sentence, not a tech slogan
Before talking about LLMs, agents or vision, write the outcome in operations language: cut identity validation time, reduce L1 tickets, extract invoice fields into the ERP without retyping.
If the sentence is only “use ChatGPT” or “build a bot”, you do not have a pilot yet — you have curiosity. Curiosity needs a short diagnosis, not a large build.
- Observable production KPI (time, error, fraud, cost, volume).
- Pilot owner (ops, product or CTO) with decision power.
- Real users ready to test around day 10–15.
Step 2 — Honest inventory of data and APIs
Useful AI almost always sits on existing systems: CRM, ERP, tickets, docs, logs, internal APIs. Without access (even read-only to a subset), the pilot invents data and proves nothing.
Discovery checks what data exists, in what shape, at what quality, and which privacy constraints apply. Many projects do not need a huge dataset — they need a reliable flow and a small scope.
Step 3 — 2–4 week scope with explicit out-of-scope
Budget burns when the pilot also includes full auth, a mobile app and custom model training. For 30 days, pick one channel and one happy path.
Write out-of-scope items: multilingual support, fine-tuning, legacy migration, full compliance. They can come later; the pilot must show ROI without waiting for perfection.
- Week 1: technical discovery + flow design + data access.
- Weeks 2–3: happy-path implementation + basic quality evaluation.
- Week 4: user test, metrics, go / no-go / iterate decision.
Step 4 — Agree go/no-go before coding
Set minimum numbers — e.g. “≥70% of tickets resolved without escalation” or “validation under 10s at ops-acceptable precision”. Missing the bar still teaches the real cost of data and integration.
In Colombia and LatAm, serious pilots often land around ~USD 2–5k depending on integrations and compliance. The point is bounded risk, not a magic price.
Checklist and next step
If you still lack clear answers to the 12 readiness questions, download the checklist and run a 30–45 minute internal meeting.
When answers are missing on purpose — no APIs, no owner, vague KPI — the next step is a 30-minute AI diagnosis, not a six-month contract.